Together, our four divisions enable us to work throughout the lifecycle of infrastructure assets, from raising and structuring funding, through programme management and design to construction, systems integration and lifetime operation and maintenance.
The four projects below show detailed case studies highlighting the scale and breath of our business.
One of the UK's busiest rail routes, the Thameslink line runs right through London from Bedford to Brighton. It's so busy, in fact, that 50% of regular users say they sometimes can't board trains because of overcrowding.
One of the worst bottlenecks on the line is the 1886 Blackfriars railway bridge and its outdated station. To bring them into the 21st century, we are widening and strengthening the bridge and building a new station across it with realigned tracks and new covered platforms spanning the River Thames. A new southern concourse will give passengers access from the south of the river for the first time.
The landmark redevelopment of one of Network Rail's most iconic stations is a tricky job, made trickier by the need to keep the station open virtually throughout the programme to minimise disruption for passengers. We have done much of the work at night and over weekends and holidays, causing as little disturbance to neighbours as possible.